type: "Changelog"
title: "4.0.0 — Hosted collaboration & the open-core structural finish"
description: "Declaration of intent for the 4.0.0 cycle, re-anchored 2026-10-06: local CLI integrity gates GA, hosted collaboration is frozen, structural work continues on 4.x."
status: "stable"
generated:
  by: "process:dockitty-export"
  at: "2026-10-19T00:00:00Z"
---

# 4.0.0 — Hosted collaboration & the open-core structural finish

**Milestone:** [`4.0.0 release scope`](https://github.com/spec-kitty/spec-kitty/milestone/11) (open; the GA gate) ·
**Status:** active (release-candidate stage; `4.0.0rc5` published 2026-10-02, `4.0.0rc6` open on `main`) · **Declared:** 2026-09-04 · **Re-anchored:** 2026-10-06 ·
**Supersedes** the retired [`3.3.x`](https://github.com/spec-kitty/spec-kitty/milestone/5)
declaration for the hosted/experience work · **Originally advanced** (see [Where the goals stand](#where-the-goals-stand-2026-10-06) for today's state): epics #1800 (SaaS sync &
event-envelope hardening), #1091 (Team Kitty launch gate), #3322 (CLI auth & token-lifecycle
reliability), #2173 (infra-to-logic ports), #2519 (charter authoring & lifecycle), #3549
(event-log integrity).

> **Direction amendment (2026-10-01).** Team Kitty / SaaS work is frozen while the
> commercial vision is reviewed, so **G1 (hosted collaboration) is off the critical path**:
> nothing hosted gates 4.0.0 GA, which is the
> [4.0.0 release scope](https://github.com/spec-kitty/spec-kitty/milestone/11) milestone alone.
> External interaction flows through the CLI's adapter module (the status fan-out, the seam
> for a publish/subscribe system); producing events and draining them are separate concerns
> with separate toggles; and the charter may ship as its own package once `specify_cli`
> reaches it only through a stable API (#645). The G1 text below is kept as the record of
> the original intent. The operator detail is in the
> [4.0.0 Milestone Roadmap](/plans/4-0-0-milestone-roadmap.md#direction-update-2026-10-01-hosted-collaboration-is-off-the-critical-path).

## Where the goals stand (2026-10-06)

The goals below are the record of what was declared on 2026-09-04. What 4.0.0 GA now means:

- **GA is local CLI integrity.** The CLI never reports success while it loses, overwrites or
  strands local work. The [4.0.0 release scope](https://github.com/spec-kitty/spec-kitty/milestone/11)
  milestone (14 open, 210 closed, due 2026-10-16) is the whole gate; 119 of its 201 closed
  issues were P0.
- **G1 (hosted collaboration) is frozen.** Every G1 epic and P0 is closed or closed as not
  planned; the client-side successor epics #3892 and #3893 wait on 4.x Work. Since
  2026-10-06 Team Kitty is no longer actively supported, and its CLI entries are hidden
  from listings (ADR `2026-10-06-1`).
- **G2 is split.** #2173 (infrastructure ports) closed on 2026-09-27; #2519 (charter
  authoring) continues on CLI 4.x stable.
- **G3 (structural strangler) continues after GA** on the 4.x line: #645 (stable application
  API, with the Mission Status Read API as its read facet), #1619 (one execution context) and
  the pack-ecosystem epics. None of it gates GA.

**Where the goals stand (2026-10-12).** GA now ships done-when-done: there is no date gate,
release candidates keep shipping, and each one still needs green CI before it is released.
The GA gate has three legs: local integrity, charter modular extraction (#645, ADR
`2026-10-12-2`), and the mission-status API backend. (2026-10-19: the charter leg is now a frozen
`charter.offering.api` seam and a green conformance corpus, not an extraction; ADR `2026-10-12-2`
is superseded by `spec-kitty-charter` ADR-0008 and ADR-0010.)

The operator detail, including the open GA issues and the decisions still owed, is in the
[4.0.0 Milestone Roadmap](/plans/4-0-0-milestone-roadmap.md#release-posture).

## Why now

A **release-queue reconciliation on 2026-08-23** retired the `3.3.x` milestone (its open work
re-triaged into 4.0.0 or Product backlog), repurposed the former `3.2.x` milestone (#4) into
**Product backlog**, and split the near-term work into discrete **3.2.6** (stabilization,
code-complete), **3.2.7** (post-reconciliation follow-ups — doctrine-term renames,
profile-load consolidation, perf CI, dedups), and **4.0.0** (this cycle) milestones. 4.0.0
is the largest open milestone (80 open issues) and had **no declaration-of-intent**, breaking
the project's own [release-goals convention](/changelog/release-goals.md) (one durable declaration per
milestone). This document is that declaration. The taxonomy re-anchor that surfaced the gap
is recorded in the milestone roadmap's
[2026-09-04 addendum](/plans/3-2-x-milestone-roadmap.md#addendum-2026-09-04--milestone-taxonomy-re-anchor-the-delayed-action-r).

## Theme

With 3.2.x's **core-domain single-sources-of-truth** substantially in place and 3.2.6 shipped
clean, 4.0.0 turns to **hosted collaboration and next-generation product capabilities** — the
hosted Team Kitty surface (sync, consent/identity, auth, launch) and the charter/runtime depth
that builds on the stabilized core. It is also the intended landing zone for the **open-core
structural strangler** that 3.2.x exists to finish — committed to this cycle by operator
decision (2026-09-04). Same discipline as the prior cycles: **no new shadow paths** — route or extract onto
an existing authority, never build a parallel one.

## Goals

### G1 — Hosted collaboration (Team Kitty)

*Off the critical path since 2026-10-01 (see the direction amendment above).*

Make the hosted surface a coherent, trustworthy product rather than a set of bolt-ons. The
durable invariants and sub-areas were held by the SaaS & Hosted Sync domain plan
(retired 2026-09-06, Convergence #3881 — the surface re-homed to the authoritative
upstream repos); this cycle ships their release-scoped work:

- **Sync & event-envelope integrity** — sync never reports success while authored state is
  stranded; every synced event carries a contract-valid envelope. Epic **#1800**; load-bearing
  P0 **#3278** (sync false success while `MissionCreated` stranded).
- **Consent & identity boundary** — only explicitly consenting projects transmit, under one
  unambiguous project→identity resolution. Load-bearing P0 **#3178** (wrong-authority egress);
  P1s **#3197 / #3196 / #3198**.
- **Auth & token lifecycle** — a logged-in CLI stays authenticated, human auth is
  browser-mediated, machine/CI auth has a supported path, refresh failures are named. Epic
  **#3322** (owns #3279 / #3277 / #3233).
- **Hosted rollout & launch gate** — fail-closed-by-default rollout, named readiness failures,
  launch defaults. Epic **#1091**.
- **Event-log integrity** — one canonical event store, honestly reported, delivered without
  silent loss. Epic **#3549**.

### G2 — Next-generation product capabilities

Deepen the governance and runtime surfaces the stabilized core now supports:

- **Charter authoring & lifecycle robustness** — the author/observe/reproduce paths, charter
  domain events, deterministic intake. Epic **#2519** (moved 3.2.x → 4.0.0 in the
  reconciliation; see the
  [Doctrine & Charter Domain Plan](/plans/domains/doctrine-charter-domain-plan.md) §3.1).
- **Infrastructure-to-logic separation** — inject ports for FS, Clock, GitOps, SaaSQueue,
  Renderer; keep the core pure and stub-testable. Epic **#2173** (moved 3.2.x → 4.0.0).

### G3 — Finish the open-core structural strangler

The G1/G2 strangler spine the 3.2.x cycle exists to finish — see
[Structural strangler spine — committed to 4.0.0](#structural-strangler-spine--committed-to-400-2026-09-04)
— is the structural foundation for 4.0.0's hosted and next-gen work. **Committed to 4.0.0 by
operator decision (2026-09-04):** the spine epics now carry milestone 4.0.0 on the live tracker.

## Committed scope (verified milestone `4.0.0`, 2026-09-04)

These epics and P0s carry milestone 4.0.0 on the live tracker:

| Item | Role | Goal | State (2026-10-06) |
|---|---|---|---|
| **#1800** | Epic: SaaS sync & event-envelope hardening | G1 | Closed |
| **#1091** | Epic: Team Kitty launch gate | G1 | Closed |
| **#3322** | Epic: CLI auth & token-lifecycle reliability | G1 | Closed; successor #3892 frozen on 4.x Work |
| **#3549** | Epic: event-log integrity | G1 | Closed; successor #3893 on 4.x Work |
| **#3278** | P0: sync reports success while `MissionCreated` stranded | G1 | Closed as not planned |
| **#3178** | P0: wrong-authority egress (FR-007 not discharged by FR-002) | G1 | Closed |
| **#2519** | Epic: charter authoring & lifecycle robustness | G2 | Open, CLI 4.x stable |
| **#2173** | Epic: infrastructure-to-logic separation (ports) | G2 | Closed |

*Verify live state via `gh issue view <n> --repo spec-kitty/spec-kitty` before acting; the
milestone description carries the one-line pointer back here.*

## Structural strangler spine — committed to 4.0.0 (2026-09-04)

The open-core structural strangler spine — the G1/G2 structural work the 3.2.x cycle exists to
finish — is **committed to 4.0.0 by operator decision (2026-09-04)**. It had sat in Product
backlog (validated, but on no committed release — exit criterion 8's anti-drift guard fired in
a blind spot, and the work rode into Product backlog silently instead of onto a release). The
epics below now carry milestone 4.0.0 on the live tracker:

| Epic | Role | Milestone (2026-09-04) | State (2026-10-06) |
|---|---|---|---|
| **#1619** | mission-execution-context root (P0) | 4.0.0 | Open, CLI 4.x stable |
| **#1797** | degod / unshim delivery | 4.0.0 | Closed as not planned |
| **#1868** | seam-binding enabler (WS4 / WS6) | 4.0.0 | Open, CLI 4.x stable |
| **#1746** | Mission Clarity Layer (P1) | 4.0.0 | Open, CLI 4.x stable |
| **#2160** | coord-artifact authority (P0) | 4.0.0 | Closed on 4.0.0 release scope |
| **#1676** | deterministic structured authoring (P0) | 4.0.0 | Open, CLI 4.x stable |
| **#2466 / #2467 / #2468** | pack ecosystem + extensibility kinds | 4.0.0 | Open, 4.x Work |
| **#2539** | pack trust / verified distribution | 4.0.0 | Open, 4.x Work |
| **#645 / #3179** | stable public API surface for doctrine & charter | 4.0.0 | #645 open on 4.x Work; #3179 closed |

**Security-debt coupling.** The 21 SonarCloud security findings (the sole failing quality
gate — 17 `S6350` subprocess + 3 `S2083` path-traversal, all pre-dating any current release
candidate) map almost 1:1 onto the degod slices above, so the security backlog rides with this
structural remediation — now both scheduled in 4.0.0. The 3 `S2083` blockers remain a
called-out ~90-min targeted fix that can land independent of any wave. (2026-10-06: the
security findings are tracked by #4304, #4305 and #2970 on 4.x Work, outside the GA gate.)

## Non-goals

- **Re-opening the 3.2.x core-domain SSOTs** — they are the stabilized foundation 4.0.0 builds
  on, not scope to re-litigate.
- **The 3.2.7 stabilization tail** — doctrine-term renames, profile-load consolidation,
  perf CI, and dedups shipped under milestone [`3.2.7`](https://github.com/spec-kitty/spec-kitty/milestone/9) (released 2026-09-10),
  not here.

## Success criteria

*Rewritten 2026-10-06; the 2026-09-04 placeholder criteria are listed below as the record.*

For 4.0.0 GA:

- [ ] The [4.0.0 release scope](https://github.com/spec-kitty/spec-kitty/milestone/11) milestone
      is closed, or each open issue is re-milestoned with a rationale.
- [ ] The nightly is green on the release commit; any `skip_nightly` waiver is an explicit,
      recorded operator decision.
- [ ] No command reports success while it loses, overwrites or strands local work (the
      consolidation, status and workflow P0s), with an explicit decision on #5780 and #5758.
- [ ] No new shadow path: no re-introduced sync transport, and only the adapter seam talks to
      an external system.

For the 4.x line after GA:

- [ ] The structural strangler spine lands or is explicitly re-dispositioned; no epic is left
      implicitly "cycle work" while off a release.
- [ ] #645 gives CLI, UI, MCP and SDK consumers one versioned surface, and `specify_cli`
      reaches the charter only through it.

Deferred with G1 (frozen 2026-10-01): hosted no-false-success and no-loss under load; the
consent/identity boundary; CLI auth across device-flow and machine paths (#3892); the Team
Kitty launch gate (closed as #1091).

## Emergent patches

Declared when the cycle activates (3.2.7 stabilization tail lands first). Following the
[emergent-milestone model](/changelog/release-goals.md): each patch advances one of the goals above; the
milestone stays open until the goals are structurally met.

## Links

- Milestone: https://github.com/spec-kitty/spec-kitty/milestone/11 (4.0.0 release scope; the original 4.0.0 milestone 8 is now "4.x Work") · Convention:
  [`release-goals.md`](/changelog/release-goals.md) · Prior cycle: [`3.2.x.md`](/changelog/3.2.x.md)
- Retired predecessor declaration: [`3.3.x.md`](/changelog/3.3.x.md) (milestone
  [`3.3.x`](https://github.com/spec-kitty/spec-kitty/milestone/5) closed 2026-08-23)
- Durable domain plans: SaaS & Hosted Sync (retired 2026-09-06, Convergence #3881) ·
  [Doctrine & Charter](/plans/domains/doctrine-charter-domain-plan.md)
- Operator execution roadmap + taxonomy re-anchor:
  [3.2.x Milestone Roadmap](/plans/3-2-x-milestone-roadmap.md#addendum-2026-09-04--milestone-taxonomy-re-anchor-the-delayed-action-r)

## Related

- [3.2.x — Doctrine-runtime depth · core-domain strangling · DevEx](/changelog/3.2.x.md)
- [Changelog](/changelog/index.md)
- [Release Goals — Declarations of Intent](/changelog/release-goals.md)
- [3.2.x Milestone — Roadmap (prior cycle)](/plans/3-2-x-milestone-roadmap.md)
- [4.0.0 Milestone — Roadmap](/plans/4-0-0-milestone-roadmap.md)
- [Doctrine & Charter — Domain Plan](/plans/domains/doctrine-charter-domain-plan.md)

## Audience

- [Stakeholder Persona: Maintainer](/context/audience/internal/maintainer.md) - Written for the Maintainer reader.