Doctrine

Design and review artifacts for the doctrine layering system: charter/runtime boundary audits, layered resolution design, org-doctrine-layer reviews, and related mission scope notes.

Reconciliation note. Most working-notes below have been retired (doc_status: deprecated) — their designs shipped or were superseded; each retired page carries an evidence banner and is preserved as a historical record. The AUTHORITY creed docs, the Layered Doctrine Resolution design blueprint (retained pending an operator durable-vs-retire ruling), the Test Quality series (input for the unmerged Mission C), and the Charter as Sole Door deferred-issues record remain live.

Tiering: AUTHORITY docs are the only citable design/sequence statements; RECORD docs are superseded inputs and verdicts kept for provenance; EVIDENCE docs are raw squad reports and measurements.

Programme realization (2026-07-26 operator ruling)

The FoundationalValues/creed programme captured by the two AUTHORITY docs above was specced as a single mission — kitty-specs/doctrine-canonical-structure-remediation-01KYEYSD/ — then split by operator ruling into five sequenced missions. 01KYEYSD is the programme record: it is specced, then split, and does not itself implement (its tasks/ carries no work packages).

Mission Slug Delivers
A doctrine-silence-guards-01KYFV7Q Guards + campsite band: I19 zero-producer lint, occurrence-map field-path granularity, the four-site silent-kind-drop closure (I2), I3b/I3c extra="forbid" + writers + round-trip, I3a schema-generation CI wiring, layout/enum ratchets, followable guidance, org→DRG bridge fix, applies hygiene
B1 drg-relation-impacts-vocabulary-01KYFV87 Relation.IMPACTS + is_symmetric, retires in_tension_with, re-points consistency_check.py. Delivers ADR 2026-07-26-3
B2 drg-edge-migration-extractor-retirement-01KYFV8C All 774 edges become authored; extractor edge production retired
C test-quality-doctrine-series-01KYFV8H The original #2935 deliverable: paradigm, DIRECTIVE_047, procedure, anti-patterns, assets, DIRECTIVE_041 intent split, CLI/CI validator parity
D foundational-values-creed-band-01KYFV8N Reachable creed band: I5, I9, I6, I13, I8, I1a, I16, I4-WP01–03, I10

Mandatory order: A → B1 → B2 → C; D gates on A only. The order is load-bearing (the programme's sequencing constraints), not preference.

Status (checked 2026-09-30): stalled after Mission A. Mission A landed (consolidated as mission 186). Missions B1, B2, C and D were created on 2026-07-26 but never got past specify: their only status event is SpecifyStarted and they have no mission number. Re-confirm the programme before resuming it. Full increment→mission mapping, the two measurements that amended the ranked list, and the D-2/D-3 rulings are recorded in manifesto-program-delivery-sequence.md § 10.

See also