Mission Notes
Transient, mission-scoped engineering notes and classifications produced while a
mission is in flight. Each note is owned by a work package as a planning
deliverable; on mission close the note is folded back into the owning mission's
kitty-specs/ artifacts.
Pages
- runtime_bridge compat-delegate classification — the authoritative forwarding-vs-real-seam classification driving the Lane-0 deshim chain of the Test-Suite Friction Remediation mission (WP02 → WP03/WP04 → WP18).
- Mission-type completion arc — pre-spec research —
ADR S0–S4 slice mapping + 3-lens research (DRG edges #2677, default-charter #2657, enumeration #2659)
and the 3-track decomposition; grounds
mission-type-drg-edges-01KXKY2N+activation-driven-enumeration-01KXKY7J.