Checklists
requirements.md
Specification Quality Checklist: Coord-Authority Gate Hardening
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-06-27 Feature: spec.md
Content Quality
- ✅ No implementation details that pre-empt design (the spec names the gate surfaces as scope anchors, not solutions)
- ✅ Focused on the value (a static gate that catches coord-read residuals before merge) and the reduce-friction constraint
- ✅ Readable by a reviewer/maintainer stakeholder
- ✅ All mandatory sections completed
Requirement Completeness
- ✅ No [NEEDS CLARIFICATION] markers remain
- ✅ Requirements are testable and unambiguous
- ✅ Requirement types are separated (Functional / Non-Functional / Constraints)
- ✅ IDs are unique across FR-###, NFR-###, and C-### entries
- ✅ All requirement rows include a non-empty Status value
- ✅ Non-functional requirements include measurable thresholds (NFR-001 zero new line-pins; NFR-004 full arch green; etc.)
- ✅ Success criteria are measurable
- ✅ Success criteria are technology-agnostic where it matters (SC-001..SC-005 framed as observable CI/behavioral outcomes)
- ✅ All acceptance scenarios are defined (primary, no-false-positive edge, partition, routing)
- ✅ Edge cases identified (legit param-passing must stay green; the false-positive risk)
- ✅ Scope is clearly bounded (C-003: static-gate + test-coverage + the single #2197 routing change)
- ✅ Dependencies and assumptions identified (#2071/#2077/#2167/#2017/#2160; verify-not-greenfield #2198)
Feature Readiness
- ✅ All functional requirements have clear acceptance criteria (mapped to SC-001..SC-005)
- ✅ User scenarios cover primary flows + the must-not-slip rule (C-001)
- ✅ Feature meets measurable outcomes defined in Success Criteria
- ✅ No implementation details leak that would constrain the planner's design freedom
Notes
- The one scope subtlety to carry into /plan: this mission is NOT purely behavior-neutral — FR-004 (#2197) is a production read-routing change paired with FR-005's scan-scope un-mask.
- C-006 records the design preference: lighter scope-unify + parameter-discipline over full inter-procedural (the friction risk).
- Validation: all items pass on first authoring; no NEEDS CLARIFICATION.