Checklists
requirements.md
Specification Quality Checklist: Next Resolves State From Committed Authority
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-08-31 Feature: spec.md
Content Quality
- ✅ No implementation details (languages, frameworks, APIs) — spec speaks in observable command behavior and domain concepts (committed status authority, operator provenance, coordination checkout); no function names or file paths
- ✅ Focused on user value and business needs — operator-facing outcomes (no restart of merged missions; no stall on operator cancellation)
- ✅ Written for non-technical stakeholders — the "user" is the operator; scenarios are in plain command-behavior terms
- ✅ All mandatory sections completed
Requirement Completeness
- ✅ No [NEEDS CLARIFICATION] markers remain
- ✅ Requirements are testable and unambiguous
- ✅ Requirement types are separated (Functional / Non-Functional / Constraints)
- ✅ IDs are unique across FR-###, NFR-###, and C-### entries
- ✅ All requirement rows include a non-empty Status value
- ✅ Non-functional requirements include measurable thresholds (0 verdict variance; 0 extra reductions; 100% fail-closed)
- ✅ Success criteria are measurable (100%/0-count outcomes; RED→GREEN regression gate)
- ✅ Success criteria are technology-agnostic (command outcomes, not internals)
- ✅ All acceptance scenarios are defined (Given/When/Then for both stories)
- ✅ Edge cases are identified (no-checkout terminal; stale-not-merged; template-like operator reason; never-started; implement vs review)
- ✅ Scope is clearly bounded (two issues; C-006 names the out-of-scope follow-ups)
- ✅ Dependencies and assumptions identified (Intent Summary assumptions; C-001..C-003 non-goals)
Feature Readiness
- ✅ All functional requirements have clear acceptance criteria (FR-001..004 → US1 scenarios; FR-005..007 → US2 scenarios)
- ✅ User scenarios cover primary flows (merged-mission recognition; operator-cancel advancement)
- ✅ Feature meets measurable outcomes defined in Success Criteria
- ✅ No implementation details leak into specification
Notes
- Items marked incomplete require spec updates before
/spec-kitty.plan. All items pass. - Post-spec adversarial squad findings folded before commit.