Checklists
requirements.md
Specification Quality Checklist: Runtime-Bridge God-Module Decomposition
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-07-11 Feature: spec.md
Content Quality
- ✅ No implementation details beyond the named refactor target (a decompose mission legitimately names the module + functions it restructures)
- ✅ Focused on maintainability value + the behavioral-parity guarantee
- ✅ Written for engineering stakeholders
- ✅ All mandatory sections completed
Requirement Completeness
- ✅ No [NEEDS CLARIFICATION] markers remain
- ✅ Requirements are testable and unambiguous
- ✅ Requirement types are separated (Functional / Non-Functional / Constraints)
- ✅ IDs are unique across FR-###, NFR-###, and C-### entries
- ✅ All requirement rows include a non-empty Status value
- ✅ Non-functional requirements include measurable thresholds (C901=0, parity byte-identical, LOC target, per-core unit test)
- ✅ Success criteria are measurable
- ✅ Success criteria are technology-agnostic at the outcome level (parity, complexity ceiling, isolation-testability)
- ✅ All acceptance scenarios are defined
- ✅ Edge cases identified (behavioral parity is the load-bearing risk)
- ✅ Scope is clearly bounded (structural-only; no logic change; gate-seam adoption OUT)
- ✅ Dependencies and assumptions identified (research confirms seams; sequenced Wave 4 after trio + orchestrator_api)
Feature Readiness
- ✅ All functional requirements have clear acceptance criteria
- ✅ User scenarios cover the maintainer + parity + pure-core flows
- ✅ Feature meets measurable outcomes defined in Success Criteria
- ✅ Structural-only scope keeps implementation detail appropriately bounded
Notes
- Brief-intake mode: requirements extracted from #2531's comprehensive body (problem, seam table, ports+cores approach, acceptance). No cold discovery interview needed.
- FR-002 mandates a research pass to confirm final seam boundaries/naming before extraction — the Key Entities list is the starting hypothesis, not frozen.
- C-004 characterization-first is load-bearing: golden
decide_next()tests land before any extraction (behavior-preserving refactor). - FR-008 / C-005 are coordination-only: leave
_check_composed_action_guarda clean seam so the later gates mission (#2535 WP14) can route it throughresolve_gates, without this mission depending on unlanded gates code. - Sequencing (C-006): Wave-4-ish per roadmap — follows trio degod (#2545) + orchestrator_api degod; does not jump the queue.
- Revised after the post-spec adversarial squad (Op 01KX8MMA). All 4 lenses endorsed the ports+cores decomposition as feasible. Applied: B1/B2 (NFR-001 parity now defines the equality/normalization contract + frozen-snapshot side-effect isolation — the safety net is now buildable); guard-purity via
ArtifactPresenceSnapshotport + pureevaluate_guards(FR-009); FR-008 retargeted to_should_dispatch_via_composition(the guard was the wrong target); C-002/FR-003 purity = no-I/O+port-injected (not no-specify_cli-import — no such arch gate); named_map_runtime_decisionE(33) + all 9 offenders (FR-004/SC-002); added the Decision-builder seam (FR-011, the highest CC lever), the phase-split (FR-010), monkeypatch-preservation (FR-012 — biggest land-ability risk), the engine-adapter (FR-013), import-cycle constraint (C-007), perf-parity (NFR-006); softened C-006 sequencing (siblings don't restructure this file). - FR-002 is now a HARD GATE: research must emit the normalization contract + enumerated fixture matrix + monkeypatch strategy + final seam boundaries before any extraction WP (SC-008).
- Ready for the FR-002 research pass → then
/spec-kitty.plan.