Checklists
requirements.md
Specification Quality Checklist: Runtime-State Corpus Cutover
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-07-20 Feature: spec.md
Content Quality
code surfaces are the domain objects (contract seams), not incidental tech choices, and are required to make requirements testable*
Context section frames the why in stakeholder terms*
- ✅ No implementation details (languages, frameworks, APIs) — *migration infra mission; named
- ✅ Focused on user value and business needs — maintainer/operator safety + the #2684 outcome
- ✅ Written for non-technical stakeholders — *as far as an infra-migration mission allows; the
- ✅ All mandatory sections completed
Requirement Completeness
writes, empty tolerated set, grep=0); the named surfaces are the acceptance targets*
- ✅ No [NEEDS CLARIFICATION] markers remain
- ✅ Requirements are testable and unambiguous
- ✅ Requirement types are separated (Functional / Non-Functional / Constraints)
- ✅ IDs are unique across FR-###, NFR-###, and C-### entries
- ✅ All requirement rows include a non-empty Status value
- ✅ Non-functional requirements include measurable thresholds
- ✅ Success criteria are measurable
- ✅ Success criteria are technology-agnostic — *outcome-framed (parity=0 mismatches, 0-byte
- ✅ All acceptance scenarios are defined
- ✅ Edge cases are identified
- ✅ Scope is clearly bounded — IC-08 optional; lane-mirror out of scope; not a bulk edit
- ✅ Dependencies and assumptions identified
Feature Readiness
must name to be testable
- ✅ All functional requirements have clear acceptance criteria
- ✅ User scenarios cover primary flows
- ✅ Feature meets measurable outcomes defined in Success Criteria
- ✅ No implementation details leak into specification beyond the contract seams the requirements
Notes
requirements necessarily name the contract seams (the phase-1 predicate, the backfill/verify library, the #2093 invariant, the two bypass readers) because those seams are the acceptance surface. This is a deliberate, scoped exception to "no implementation details" — the alternative (paraphrasing the seams) would make the requirements untestable.
- This is a staged production-default migration mission; unlike a greenfield feature spec, its
- IC-08 (FR-011) is explicitly optional and does not gate Definition of Done.
- Items marked incomplete require spec updates before
/spec-kitty.plan. All items pass.