Implementation Plan: [MISSION]
Branch: [###-mission-name] | Date: [DATE] | Spec: [link] Input: Feature specification from /kitty-specs/[###-mission-name]/spec.md
Note: This template is filled in by the /spec-kitty.plan command. See src/doctrine/missions/software-dev/command-templates/plan.md for the execution workflow.
The planner will not begin until all planning questions have been answered—capture those answers in this document before progressing to later phases.
Summary
[Extract from mission spec: primary requirement + technical approach from research]
Technical Context
<!-- ACTION REQUIRED: Replace the content in this section with the technical details for the project. The structure here is presented in advisory capacity to guide the iteration process.
If multiple developers/agents will work on this mission, add a "Parallel Work Organization" section below showing the dependency graph and agent assignments. -->
Language/Version: [e.g., Python 3.11, Swift 5.9, Rust 1.75 or NEEDS CLARIFICATION] Primary Dependencies: [e.g., FastAPI, UIKit, LLVM or NEEDS CLARIFICATION] Storage: [if applicable, e.g., PostgreSQL, CoreData, files or N/A] Testing: [e.g., pytest, XCTest, cargo test or NEEDS CLARIFICATION] Target Platform: [e.g., Linux server, iOS 15+, WASM or NEEDS CLARIFICATION] Project Type: [single/web/mobile - determines source structure] Performance Goals: [domain-specific, e.g., 1000 req/s, 10k lines/sec, 60 fps or NEEDS CLARIFICATION] Constraints: [domain-specific, e.g., <200ms p95, <100MB memory, offline-capable or NEEDS CLARIFICATION] Scale/Scope: [domain-specific, e.g., 10k users, 1M LOC, 50 screens or NEEDS CLARIFICATION]
Constitution Check
GATE: Must pass before Phase 0 research. Re-check after Phase 1 design.
[Gates determined based on constitution file]
Project Structure
Documentation (this mission)
kitty-specs/[###-mission]/
├── plan.md # This file (/spec-kitty.plan command output)
├── research.md # Phase 0 output (/spec-kitty.plan command)
├── data-model.md # Phase 1 output (/spec-kitty.plan command)
├── quickstart.md # Phase 1 output (/spec-kitty.plan command)
├── contracts/ # Phase 1 output (/spec-kitty.plan command)
└── tasks.md # Phase 2 output (/spec-kitty.tasks command - NOT created by /spec-kitty.plan)
Source Code (repository root)
<!-- ACTION REQUIRED: Replace the placeholder tree below with the concrete layout for this mission. Delete unused options and expand the chosen structure with real paths (e.g., apps/admin, packages/something). The delivered plan must not include Option labels. -->
# [REMOVE IF UNUSED] Option 1: Single project (DEFAULT)
src/
├── models/
├── services/
├── cli/
└── lib/
tests/
├── contract/
├── integration/
└── unit/
# [REMOVE IF UNUSED] Option 2: Web application (when "frontend" + "backend" detected)
backend/
├── src/
│ ├── models/
│ ├── services/
│ └── api/
└── tests/
frontend/
├── src/
│ ├── components/
│ ├── pages/
│ └── services/
└── tests/
# [REMOVE IF UNUSED] Option 3: Mobile + API (when "iOS/Android" detected)
api/
└── [same as backend above]
ios/ or android/
└── [platform-specific structure: feature modules, UI flows, platform tests]
Structure Decision: [Document the selected structure and reference the real directories captured above]
Complexity Tracking
Fill ONLY if Constitution Check has violations that must be justified
| Violation | Why Needed | Simpler Alternative Rejected Because |
|---|---|---|
| [e.g., 4th project] | [current need] | [why 3 projects insufficient] |
| [e.g., Repository pattern] | [specific problem] | [why direct DB access insufficient] |
Parallel Work Analysis
Include this section if multiple developers/agents will implement this mission
Dependency Graph
[Identify what must be built sequentially vs what can be done in parallel]
Example:
Foundation (Day 1) → Wave 1 (Days 2-3, parallel) → Wave 2 (Days 4-5, parallel) → Integration (Day 6)
Work Distribution
- Sequential work: [What must be done first before parallel work can begin]
- Parallel streams: [Independent work that can be done simultaneously]
- Agent assignments: [Who owns which files/modules to avoid conflicts]
Coordination Points
- Sync schedule: [When parallel workers merge their changes]
- Integration tests: [How to verify parallel work integrates correctly]