Checklists
requirements.md
Specification Quality Checklist: Software-Dev Mission Composition Rewrite
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-04-25 Feature: spec.md
Content Quality
- ✅ No implementation details (languages, frameworks, APIs)
- Note: Source paths and module names appear in Key Entities as identifiers (acceptable per template — entities are named, not implemented). FR/NFR/Constraint text stays at the architectural-contract level.
- ✅ Focused on user value and business needs
- Operator-facing scenarios drive the spec; the "user" is the operator running the slash commands.
- ✅ Written for non-technical stakeholders
- Architectural stakeholders are the primary audience here (per START-HERE.md). Spec stays at contract level rather than implementation detail.
- ✅ All mandatory sections completed
Requirement Completeness
- ✅ No [NEEDS CLARIFICATION] markers remain
- ✅ Requirements are testable and unambiguous
- ✅ Requirement types are separated (Functional / Non-Functional / Constraints)
- ✅ IDs are unique across FR-### (FR-001..011), NFR-### (NFR-001..004), C-### (C-001..008) entries
- ✅ All requirement rows include a non-empty Status value (all "Active")
- ✅ Non-functional requirements include measurable thresholds (NFR-001 wall-clock ±15%, NFR-002 file presence, NFR-003 named test files green, NFR-004 diff scope)
- ✅ Success criteria are measurable (SC-1 artifact equivalence, SC-2 governance scope match, SC-3 named test paths green, SC-4 named subsystem regression-free)
- ✅ Success criteria are technology-agnostic at the user-outcome level (operator runs commands, gets equivalent artifacts)
- ✅ All acceptance scenarios are defined (AS-1..6)
- ✅ Edge cases are identified (EC-1..5)
- ✅ Scope is clearly bounded (Constraints C-004..008 + assumptions)
- ✅ Dependencies and assumptions identified (Dependencies + Assumptions sections)
Feature Readiness
- ✅ All functional requirements have clear acceptance criteria
- ✅ User scenarios cover primary flows (full lifecycle through composition)
- ✅ Feature meets measurable outcomes defined in Success Criteria
- ✅ No implementation details leak into specification
Notes
- All checklist items pass on the first iteration.
- Three explicit assumptions (A-1 tasks-mapping, A-2 tasks profile default, A-3 legacy-file disposition) are flagged for confirmation in plan review rather than blocking specify.
- Out-of-scope guardrails (events package, libraries-vs-charter alignment) are codified in C-007 to align with the concurrent-agent boundary the user explicitly carved out.