Plans

Investigations, research deliverables, initiatives, user journeys, and design notes — the distil-then-retire working surface (Mission B, FR-009).

Content here carries a doc_status of draft or active; once distilled into durable architecture/reference docs it is retired. This section is the unified home for the architecture/-rooted plans content:

  • research/ — research deliverables (era spikes/explorations).
  • initiatives/ — active architecture initiatives.
  • user_journey/ — end-to-end user-journey docs.
  • notes/ — legacy (1.x) design notes.
  • Loose investigation/trace docs (e.g. the Windows-compatibility mission review and the test-suite-acceleration plan).

Current milestone roadmap

The 3.2.x milestone roadmap is the operator-facing execution roadmap for the current milestone. The durable declarations of intent it executes live in release goals; as a plans/ document, the roadmap itself follows the distil-then-retire lifecycle.