Specification Quality Checklist: Assertive Test Suite Sanitation

Reviewed: 2026-08-10 Result: PASS

Content Quality

  • ✅ No implementation framework or code-structure design leaks into stakeholder requirements.
  • ✅ Focuses on maintainer outcomes and trustworthy defect detection.
  • ✅ Written for maintainers and reviewers.
  • ✅ Every mandatory section is complete.

Requirement Completeness

  • ✅ No unresolved clarification markers remain.
  • ✅ Requirements are testable and unambiguous.
  • ✅ Success criteria are measurable.
  • ✅ Functional, non-functional, and constraint requirements are separated.
  • ✅ Every requirement has a stable ID and populated status.
  • ✅ Non-functional requirements include measurable thresholds.
  • ✅ Acceptance scenarios cover primary, failure, duplicate, structural, and CI-routing flows.
  • ✅ Edge cases include slow unique guards, platform coverage, migration age, setup failures, and collection attribution.
  • ✅ Scope and non-goals are explicit.
  • ✅ Assumptions, dependencies, and tracker references are identified.

Mission Readiness

  • ✅ Every functional requirement has observable acceptance evidence.
  • ✅ User scenarios are independently testable.
  • ✅ Outcomes distinguish causal coverage from line-count and marker proxies.
  • ✅ The deletion rubric prevents both green-washing and blanket preservation.
  • ✅ Branch target and PR-only delivery are explicit.

Validation Notes

  • Pre-spec squad: reviewer-renata, randy-reducer, and debugger-debbie converged on evidence-led assertive deletion. The original agent transcripts were not persisted; the later evidence audit and this limitation are recorded in grounding-report-2026-08-10.md.
  • Post-spec squad blockers were resolved: contract/architectural gates are unconditional; evidence granularity is family-defined with node expansion on divergence; flake/timing matrices are finite; migration retirement requires compatibility authority; and FIX_* states cannot close the mission. Post-plan authority review corrected P0 handling to the accepted red-main ADR: exactly one live blocking red per accepted P0, separately accounted from release authority.
  • Live baseline: 37,444 nodes collected in 94.26 seconds; repeated full-suite start exposed #3283 before test bodies executed.
  • Post-plan squad: all reducer, reviewer, and architect findings resolved. The plan uses a lightweight global census, class-specific deep proof, mission-local audit tooling, WP-owned evidence shards, an explicit #3283 lease/atomic-publish protocol, and typed environment/route/workload evidence.
  • Healthy base run after manual prewarm: 37,298 passed, 24 failed, 2 errored in 1,689.48 seconds. #2782 was existing; #3284 records the other 23 failures and two errors before baseline acceptance.
  • Bulk-edit classification: not applicable; the mission adjudicates heterogeneous tests rather than replacing one repeated identifier/string.