Checklists
requirements.md
Specification Quality Checklist: MissionResolver Port (2173 Phase 2)
Purpose: Validate specification completeness and quality before proceeding to planning Created: 2026-07-08 Feature: spec.md
Content Quality
- ✅ No implementation details (languages, frameworks, APIs) — see Note 1: this is an infrastructure enabler mission; code-surface terms are the domain language, captured in the Domain Language table, not incidental leakage
- ✅ Focused on user value and business needs — the value is a testable execution-context builder (the #1619 unblock)
- ✅ Written for non-technical stakeholders — Purpose (stakeholder-facing) TL;DR + Context lead; technical detail is scoped to requirements
- ✅ All mandatory sections completed
Requirement Completeness
- ✅ No [NEEDS CLARIFICATION] markers remain
- ✅ Requirements are testable and unambiguous
- ✅ Requirement types are separated (Functional / Non-Functional / Constraints)
- ✅ IDs are unique across FR-###, NFR-###, and C-### entries
- ✅ All requirement rows include a non-empty Status value (Draft)
- ✅ Non-functional requirements include measurable thresholds
- ✅ Success criteria are measurable
- ✅ Success criteria are technology-agnostic — see Note 1
- ✅ All acceptance scenarios are defined (S1–S6 + edge cases)
- ✅ Edge cases are identified
- ✅ Scope is clearly bounded (In / Out / Anti-fold sections)
- ✅ Dependencies and assumptions identified
Feature Readiness
- ✅ All functional requirements have clear acceptance criteria
- ✅ User scenarios cover primary flows (S1 is the primary unblock)
- ✅ Feature meets measurable outcomes defined in Success Criteria
- ✅ No implementation details leak into specification — see Note 1
Notes
enabler (a dependency-injection seam). Its "users" are the CLI runtime, test authors, and downstream missions, so the acceptance surface is necessarily expressed in code-surface terms (resolver, shell, frozen context, arch-gate). These are defined in the spec's Domain Language table. This mirrors the in-lineage coord-primary-partition-lock-01KWZ46V spec's precedent. The stakeholder-facing value is kept technology-agnostic in the Purpose TL;DR.
- Note 1 — Infrastructure-mission technicality is intentional, not leakage. This is a code-internal
- Squad grounding and decision rationale live in the three
tracer-*.mdfiles alongside this checklist.